Uncategorized Welding and Connection of Pipework The final connection and of the heat collectors to the pipework leading to the heat pump has been completed. All pipe work was electrofused
Uncategorized Thermal Response Test Completed Today a Thermal Response Test (TRT) was completed on the GeoKoax Borehole at the Druids Glen site. The purpose of the Thermal Response Test is to determine the ground thermal …