Thermal Response Test Completed

Today a Thermal Response Test (TRT) was completed on the GeoKoax Borehole at the Druids Glen site. The purpose of the Thermal Response Test is to determine the ground thermal …

Sensor Installation

The downhole sensor system described here was completed by the 21st October. The sensors were inserted downhole along with the collectors earlier in September, but successful installation of the thermocouples above ground …

Grouting Completed

The team returned to the Druids Glen Site on the 23rd of September to backfill the three successfully drilled holes with a special thermally conductive grout.  The grout used was “ThermoCem …

Drilling Operations

Drilling on the Druids Glen site commenced on the 14th of September and ran until 16th of September. The drilling was conducted by Nicholas Wall of Walls Well drilling. Drilling …